MACUTI

Trailing suction hopper dredge was built in 2012
Description: Prefabrication and installation of piping and hydraulic systems
Pipes material: steel. DN 40- 700 mm

Key facts:
- 82 m lenght and 16 m breath
- Speed 10 knots
- 11 km of piping systems are installed

macuti

SAAREMAA

Ferry was built in 2008. Ferries that operate between Estonian islands are fast and highly manoeuvrable – the steering mechanisms can rotate for 360°, they are easy to moor an unmoor from the quays

Key facts:
- 97,9 m length and 18,5 m breadth
- Ferry capacity is 600 passengers and 150 cars
- Maximum speed 15 knots
- More than 10 km of piping systems were installed

BARD 1

Was built in 2009. Transformer platform which shall generate alternating electric current, produced by the North Sea Bard wind power park, into the constant current, and shall transmit it to the grid system.

Key facts:
- 42,1 m length and 42 m breadth
- Weight 3000 t
- Power 400 MW
- More than 8 km of piping systems were installed

 bard1

GITTE HENNING S349

Running turnkey project. Fishing trawler will be ready for delivery by the end of year 2013

Key facts:
- 86,3 m length and 17,6 m breadth
- Maximum speed 17,0 knots
- More than 100 tons of steel pipes installed
- 6,3 tons plastic pipes installed
- 6,9 tons AISI pipes installed

WINDLIFT 1

Was built in 2011. Ship designed for the construction and maintenance of wind farms.

Key facts:
- 101,8 m length and 36 m breadth
- Weight 8000 tons
- Maximum speed 10,1 knots
- More than 13 km of piping systems were installed
- 3,45 km of hydraulic piping systems were installed